
This project delivered a multi-story steel frame structure for chemical production, requiring strict control over load-bearing capacity and structural stability.
The design supports heavy equipment installation while maintaining safe operational margins across all floors.
Three-story steel structure
Total structural height: 21 meters
Minimum floor load capacity: ≥ 1.5 tons/m²
Headquarters:
Creating Center, No.142, Yuhe Road, Lecong Town, Shunde District, Foshan City, Guangdong Province, China. 528315
Factory: Liyuan Logistics City, Chencun Town, Shunde District, Foshan City, Guangdong Province, China. 528313
Australia Local Support Base: (Yatala, QLD) – Coming 2026